News from Jenny Jones: Suburban cycling cut to pay for central London cycling
Analysis of new figures released by Transport for London shows how the Mayor is planning to spend £57m on a Velib style cycle hire scheme in central London whilst spending less on schemes which would benefit cycling in outer London. New figures show that out of a total of 383 schemes which have not been funded in the coming year, 260 are in outer London boroughs.
A provisional breakdown of the £111m cycling budget for 2009/10 has been sent to Jenny Jones. TfL have allocated nearly half the money to cycle hire and £12m to the cycling superhighways, which are fast commuter routes into central London. However, nothing is specifically allocated in the coming year to cycling hubs in outer London and the total spent on the pan London Cycle Network will be just over a third of what it has been this year.
Jenny Jones said:
“I think that the cycle hire scheme is brilliant and so is the idea of cycling superhighways, but the London mayor is paying for these high profile schemes by cutting hundreds of local schemes which would make cycling safer in London. We have a zone one cycling mayor who is giving far less money to the London Cycle Network in outer London, despite the advice from experts who tell him that four fifths of the potential new cyclists come from the suburbs.”
Notes to Editors
1. Analysis of the money provided to the boroughs for the LCN+ shows that a total of 383 schemes have not been funded in the coming year, 260 of them in outer London boroughs, see attached table based upon Question to the London mayor No: 2698 / 2008.
2. TfL’s cycle hire scheme is aiming for 55,000 cycling trips per day by bike. At present there are around 540,000 cycling trips.
3. Money spent on LCN+ was £33m in 2008/09, but drops to only £12m in 2009/10. These total figures are divided up between borough roads and the Trans London Road Network (TLRN). The LCN+ expenditure on the borough roads drops from £20 to £10m, whilst the LCN+ spending on the TLRN drops from £13m to £2m.
4. The London mayor has the target of a 400% increase in cycling, but the Transport for London report which proposed this target showed that 80% of the new potential cyclists would have to come from outer London.
For more details please contact the Green Party Group Press Officer - Ian Wingrove on 0207 983 4424, 07967 205 330 Ian.Wingrove@london.gov.uk
--------------------------------------------------
cycling, croydon
Wednesday, 1 April 2009
Suburban cycling cut to pay for central London cycling
Wednesday, 4 March 2009
St James's Park follow up - LCN 5
I've just found this rather out of date consultation on the Croydon Council web site, it is of interest as I was involved in pushing for the original scheme back in 2002.
St James's Park - Proposed Cycle Safety Scheme
with an associated map
I had thought the outcome would have been reported back to the Croydon Cycle Forum, but I can't find any trace....
Satellite Image
--------------------------------------------------
cycling, cycle lane, croydon
Sunday, 16 March 2008
Addiscombe Road - TfL remove the lane
This post is dedicated to the two friendly, young policemen who stopped and searched me under the Terrorism act whilst I was trying to take these photos. Sorry guys I can't remember your names, but if you'd like to add a comment then it would round out this post nicely.
An email from Jim notified us that the cycle lane had been removed, as predicted by another cyclist. The cycle lane now suddenly stops some distance from the junction, at the point where the traffic is directed into two lanes.
The advanced stop line still exists, and has now been painted green.
However, the ASL box is completely useless as not only is it almost impossible to get to in heavy traffic, without going round the outside, it is also technically illegal to enter the box on a bicycle because there is no cycle lane giving entry.
Satellite Image
--------------------------------------------------
cycling, cycle lane, croydon
Saturday, 1 March 2008
Addiscombe Road - now it's dangerous!
The recently refurbished cycle lane, LCN 75 westbound on Addiscombe Road, was looking like a real improvement over the previous road markings, with a lane wider than the usual Croydon crap which was mostly clear of traffic.
Not any longer, it is now looking pretty dangerous.
An extra line has been added to the junction to signify that the traffic should form two lines.
This pushes most of the cars into the cycle lane.
This is in response to the buses which turn right at this point.
The result for anyone trying to use the cycle lane is a disaster.
The TfL engineer responsible for this cock up should be forced to ride this junction repeatedly in heavy traffic until s/he gets the message.
Satellite Image
--------------------------------------------------
cycling, cycle lane, croydon
Wednesday, 27 February 2008
Addiscombe Road - was it a cockup?
Just had this message from a Croydon Cyclist
"Make the most of those wonderful wide cycle lanes, for tonight they will shrink to the size you are more familiar with. Apparently the contractor made a mistake on the original dimensions."
If this is true it just goes to prove how fucked up cycle infrastructure design is in Croydon.
Satellite Image
--------------------------------------------------
cycling, cycle lane, cycle path, cycle track, croydon
Saturday, 14 July 2007
St James's Park Road - LCN Route 5
Our first video contribution to the site:
There was a long fight to get this contraflow cycle lane, but the way in which parking bays were left in the cycle route created a problem at the junction with Windmill Road where most drivers turn in and cut the corner.
Satellite Image
P.S. Filming whilst cycling is not recommended.
--------------------------------------------------
cycling, croydon
Friday, 11 May 2007
Godstone Road, Purley
Just on the southern edge of Croydon lies Purley, and yet another poorly thought through cycle lane. This one is on the southbound side of the Godstone Road (the A22) at the junction with Approach Road.
The somewhat narrow cycle lane disappears within a yard or two, a new, boldly marked cycle lane appears:Take this enticing option and within a few yards you will be suddenly forced to choose between hitting the crash barrier or the side of the passing lorry. Alot of heavy goods traffic uses this road.
At first sight it looks like a good idea - a feeder lane to allow cyclists to get to the advance stop line when the cars are stopped. But if the traffic is moving you'll get a very nasty surprise.
Well intentioned, but probably much safer to not use it.
Satellite Image
--------------------------------------------------
purley, croydon, cycling, cycle lane, cycle path, cycle track
Saturday, 21 April 2007
Cairo New Road - LCN 75

A case of excessive complexity and silly markings brought on by the presence of tram tracks.
Aproaching from the south,
the cycle track crosses two tram tracks
and instead of some simple dotted white lines, there are two separate lanes.
This final give way for the footpath is a work of pure Croydon surrealism.
Satellite Image
--------------------------------------------------
Tags croydon,cycling, cycle lane, cycle path
Wednesday, 4 April 2007
South Park Hill Road - LCN route 76
These are gutter cycle lanes of the very worst kind. They were put in at the end of 2000 and made the road so dangerous I have stopped cycling on it. When I complained to Croydon Council the junior council officer who replied tried to blame the cycle lanes on a request from a local resident.
These lanes are officially only 80cm wide. Drivers using the road now expect bicycles to get out of their way and use these dreadful lanes, when it simply is not safe to cycle that close to the edge of the road. The problem is particularly acute because this road is a busy bus route and contains several schools where parents park illegally on the road and on the pavement every morning.
The cycle lanes run along both sides of South Park Hill Road in Croydon, the B243 linking Coombe Road with Croham Road. This road slopes up to a blind summit where there is are private schools, bus stops and a well used footpath crosses from South Croydon railway station. The slope is especially steep at the southern end.
Croydon Council have failed to take any notice whatsoever of national government guidance on these matters. Back in 1996 the DoT, as it was then, published a joint guidance publication called "Cycle-friendly Infrastructure". It gave guidance on the design of cycle lanes (page 46, paragraph 11.3.2):
"Cycle lanes on links should be a minimum of 1.5m wide and 2m wherever possible.... Widths below 1.5m give cyclists very little room to manoeuvre around debris, potholes and drainage grates..."
The response from the council's so called "cycling officer" to my complaints was to blame the cycle lanes on a request from local resident, and the poor standards set by the London Cycle Network Design Manual.
This dangerous road has been added to the London Cycle Network as route 76, though it is a completely detached section with a highly dangerous double mini roundabout at the northern end and a very nasty section of road and another mini roundabout to the south.
Satellite Image
--------------------------------------------------
Tags croydon,cycling, cycle lane
Saturday, 31 March 2007
Whitehorse Lane Updated
Well nothing has changed, despite the publicity given to the original photograph nearly five years ago.
This route isn't just any old crap cycle lane, it is in fact route 23 on the London Cycle Network.
Whitehorse Lane (LCN route 23)
Old one this, it may have been modified since I took this photograph in July 2002, but I doubt it.
As featured in the Croydon Advertiser and Warrington Cycle Campaign Cycle Facility of the Month, September 2002.
This innovative shared-use footway/cycle-lane/parking-space has only been made possible by the latest developments in full-suspension mountain bikes. Cycle training courses in Croydon now include a module on riding over parked cars, thus avoiding the hazard of being hit by an opening door.

